GENEVA PUBLIC LIBRARY DISTRICT

127 James Street  | Geneva, IL 60134 | 630-232-0780 phone | 630-232-0881 fax

contact us anytime at board@gpld.org

Please reload

Recent Posts

Parking lot for new library takes shape

November 5, 2019

Crews have begun work on the parking lot for the new library.

 

 

Work on the parking lot and sidewalks has begun, and interior work is well underway on the new Geneva Public Library at 227 S. Seventh St.

 

After consulting with their building team, Library officials hope that construction will be completed after the beginning of the year. The opening day will be determined at a later date.

 

A view of the new library from Seventh Street. The round space in the center on the upper level is the Quiet Reading Room. Below that is the drive-up window.

 

 

WHAT WILL THE NEW LIBRARY FEATURE?

 

The 57,000-square-foot building will include:

 

• enhanced collections and programs
• 76 off-street parking spaces
• drive-up convenience to pick up and drop off books and materials
• a variety of meeting areas
• exhibit space
• outdoor reading spaces 
• ADA compliance, making it accessible for all

 

A worker puts finishing touches on the main meeting room, which is located along Sixth Street.

 

 

-> The Library will feature an enhanced children’s area that includes:

 

• a program and craft room
• an outdoor program space
• play areas for young children
• learning space for elementary school-aged children
• middle school lounge space
• developmentally appropriate collections
• learning opportunities for children from birth through eighth grade

 

-> Teens will have their own space as well as access to more books and materials  

 

Our community can enjoy using a variety of new spaces that offer:

 

• enhanced collections
• a quiet reading and study area
• an indoor/outdoor fireplace
• two outdoor balconies
• bookable study rooms
• two meeting rooms that can hold a variety of programs 
• a demonstration kitchen
• a collaboration zone for group projects or solo work

 

> Library service will be expanded to include: 

 

• a technology area where you can use or check out equipment, take classes, and create digital works
• a craft room for classes and drop-in projects
• lab spaces for experimenting 

 

A view of the new library taken at Sixth and Campbell streets.

 

The pedestrian entrance is located on Campbell Street (center), and crews have begun sidewalk installation.

 

A view from Seventh and Campbell streets showing the layout of the sidewalk. The windows look into Kids Landing. The rooms above are bookable spaces for the community to use for work, studying, meetings, and more.

 

Another view from Seventh and Campbell streets.

 

Crews are making progress on the parking lot. 

 

 

WHAT ARE PLANS FOR THE PARK ON THE SITE? The Park District held a public meeting in September to select the playground design. The playground will be located at Sixth and Franklin streets. The start date for installation will be determined later.

 

WILL THE LIBRARY BE CLOSED DURING THE MOVE TO THE NEW LIBRARY? We will close, but dates are not yet set for our move or opening day. We’ll post updates to gpld.org and our Facebook Page as we know more.

 

WHERE CAN I KEEP UP WITH PROGRESS? Check back at gpldnewbuilding.org for a comprehensive overview of the plans for the new library and regular updates. Please contact us anytime at Board@gpld.org.

 

 

Please reload

Please reload

Archive